We survived the storm of 14th of the January.
Our bowsprit is finished at KVA, and is waiting to be mounted. We moved the ships a bit today to allow an easier installation, but the rain stopped us from commencing that work.
I and Robert have installed cables from almost every solar panel now, and we wait for the large 35mm² cables to arrive before we can complete that part of the electrical system.
The weather is continuously getting worse. It has rained almost all day long, and the wind is increasing to a strong gale this night.